Electricity: Power generation plunges to 495MW with 3 plants on grid
Business Top stories
2 min read
47

Electricity: Power generation plunges to 495MW with 3 plants on grid

April 5, 2022
0

Nigeria’s electricity challenge worsened yesterday as grid power generation crashes to 495.20 Megawatts with just Jebba Hydro (335MW), Olorunsogo NIPP (107.20MW) and Sapele (53MW) on the grid as at 3pm. Earlier checks by the Energy Reportdaily on data from the National System Operator, NSO, showed that as at 2pm total

Continue Reading